99国产视频-www毛片-亚洲黄色小视频-午夜精品国产-超碰首页-在线综合网-久久综合婷婷-超碰777-成人av入口-天天操人人-欧美男女性生活视频-国产精品一级视频-亚洲伦理影院-亚洲丝袜色图-不卡av免费在线观看

Welcome to Changxing Baodi Environmental Protection Technology Co., Ltd!

中文版 | English
 
Your current position: Home >> Changxing atomic ash manufacturer explains the use of atomic ash in coating process

Changxing atomic ash manufacturer explains the use of atomic ash in coating process


 1. Requirements for workpiece to be coated with atomic ash

 
The primer of the workpiece to be scratched must be dry; There shall be no oil, dust and other dirt. These three items are the minimum requirements for coated and scraped workpieces.
 
If the primer is not dry enough, the solvent in the primer cannot continue to volatilize after scraping the atomic ash and curing, and is sealed under the atomic ash layer. In case of high temperature, bubbles are easy to peel off. If there is oil and dust, the adhesion between the atomic ash layer and the primer will be affected, and the atomic ash layer will fall off seriously.
 
2. Preparation and conventional coating of atomic ash
 
Preparation of atomic ash: it shall be prepared according to the requirements in the product operation manual. The main ash and curing agent must be mixed evenly before use.
 
The ratio of curing agent to main ash is generally 2:100, but it can also be adjusted within the range of (1.5 ~ 3): 100 according to the temperature and actual operation. Too much or too little curing agent may cause adverse effects.
 
Scraping and coating atomic ash is a link with high technical requirements in the coating process. It is required that the surface of the workpiece after coating and scraping shall be as flat as possible, and the coating and scraping defects - sand holes, scratches, wild paste and other defects shall be minimized. Generally, atomic ash shall be coated and scraped for 3 ~ 4 times. The following is a brief description of the operation requirements of each pass.
 
Apply the first coat of atomic ash
 
The purpose of the first layer of atomic ash is to fill and scrape large pits. It is painted and scraped with a wide hard scraper, only for leveling, not for smoothness. It is not allowed to scrape back and forth many times during operation, so that the pores in the atomic ash are stuck, which will cause long-term non drying and affect the construction. When applying and scraping, the scraper shall form an angle of 60 ° with the surface of the coated object, and apply and scrape slightly in an arc. Grind after drying, remove the floating ash, and then carry out the second layer of atomic ash.
 
Apply the second layer of atomic ash
 
The purpose of the second layer of atomic ash is still to fill the low recesses. The coating thickness shall be less than that of the first layer. A hard scraper shall be used for the plane, and a rubber scraper can be used for the round bend. When applying and scraping, pay attention to the horizontal direction of the car shape; From right to left, from top to bottom; In order to reduce the coating and scraping interface, the coating and scraping shall be lengthened as much as possible, and the construction requirements shall mainly level the low part.
 
Grind after drying, remove the floating ash, and then carry out the third layer of atomic ash.
 
Apply the third layer of atomic ash
 
The purpose of the third layer of atomic ash is mainly to scrape the pores, sandpaper marks and small depressions left by the previous layer of atomic ash. Smooth and smooth during coating and scraping. Scrapers with good elasticity shall be used during construction, and certain pressure shall be applied to make the scraped atomic ash layer smooth and less pores. Grind smooth after drying, and conduct the fourth layer of atomic ash after cleaning the surface.
 
Apply the fourth layer of atomic ash
 
The role of the fourth atomic ash is basically the same as that of the third atomic ash. It can also be called "fine scraping atomic ash". It is required to dilute the atomic ash and fully apply it once, so that the outer surface of the whole vehicle body can be thinly, smoothly and evenly coated with a layer of atomic ash.
 
Only the workpiece qualified by the above treatment can enter the next process - intermediate coating.
 
Coating defects caused by improper use of atomic ash
 
The finishing coat is the last process in the automobile coating process.
 
If there is a problem after finishing, it is the most troublesome. The following is a brief introduction according to the problems in production.
 
(1) The top coat foams after baking
 
Scrape off the bubbles after the bubbles in the finish coat, and see which layer the bubbles are on. If the bubbles appear in the primer layer, the atomic ash is well combined with the primer, and the substrate treatment may not be in place; After blowing off the bubbles, it is found that there is a layer of primer on the atomic ash and the substrate, then the primer may be too thick or the primer may not be completely dry.
 
(2) Pinholes and depressions appear after baking the finish paint
 
First, consider whether the atomic ash itself causes pinhole quality problems.
 
Secondly, if pinholes appear when the quality of atomic ash is qualified, it is generally because the atomic ash scraping and grinding technology is poor and the sand holes are not handled well.
 
In addition, during the scraping process, if the scraping tool is improperly selected, it will also cause pinholes.
 
(3) "Prickle" after baking the finish coat
 
First, the climate is too humid and the water absorption of atomic ash is too large. The polished atomic ash adsorbs a considerable amount of water. The finish paint is sprayed before the water volatilizes. A small amount of water is sealed under the paint film. Once heated, the water volume expands sharply, breaking through the paint film to form "prickly heat".
 
Second, the water absorption of atomic ash is qualified. After hot air drying, spray the finish coat, and "prickly heat" appears after baking. Then it may enter the drying room before the solvent volatilizes fully after spraying the finish coat. In this way, due to the rapid closure of the finish coat surface, the residual solvent has to break through the paint film to form "prickly heat". Of course, it may also be the quality problem of the topcoat, or the "prickly heat" caused by the mismatch between the polarity of the solvent and the topcoat.


PrevWhat are the advantages of mechanical atomic ash
NextMatters needing attention in the use of atomic gray modulation

Copyright © 2020 Changxing Baodi Environmental Protection Technology Co., Ltd all reserved Web Admin --> >>

浙公網安備 33052202000243號?浙ICP備17019658號

主站蜘蛛池模板: 最新视频在线观看 | 伊人影院av | 天天插插 | 国产乱码精品一区二区三区中文 | 国产精品高清在线观看 | 久久精品小视频 | 国产精品zjzjzj在线观看 | 人妻丰满熟妇aⅴ无码 | 国产精品美女久久久 | 中文字幕丰满乱子伦无码专区 | 日产电影一区二区三区 | 狼人狠狠干 | 老汉av网站 | 麻豆视频免费网站 | 玖草视频在线观看 | 午夜裸体性播放 | 国产精品视频一区二区在线观看 | 狠狠入 | 国产一区二区三区高清视频 | 免费黄色网址大全 | 免费黄色片视频 | 黄色片视频网站 | 污网站在线播放 | 精品一区二区三区在线视频 | 波多野结衣有码 | 国产资源av| 男男大尺度| 91jk制服白丝超短裙大长腿 | www.狠狠爱| 超碰caoporen| 国产成人精品自拍 | 欧美日韩在线播放 | 色综合免费视频 | 在线免费一级片 | 亚洲天堂网在线观看 | 97干干| 国产人与禽zoz0性伦 | 巨大乳の揉んで乳榨り奶水 | 少妇高潮伦| 又黄又湿的网站 | 丹丹的呻吟声1一7 | 日韩av一区二区三区四区 | 最新欧美日韩 | 3d动漫啪啪精品一区二区中文字幕 | 欧美sm极限捆绑bd | 大胸喷奶水www视频妖精网站 | 91久久在线观看 | 亚洲免费视频一区二区 | 日韩国产专区 | 色欲久久久天天天综合网 | 美女大逼 | 男女无遮挡做爰猛烈视频 | 成年人黄视频 | 伊人久久影视 | 免费人成在线观看网站 | 超碰人人人 | 黑人巨茎大战欧美白妇 | 无码人妻精品一区二区三区蜜桃91 | 偷偷草 | 国产大学生自拍视频 | aaa成人| 国产乱子伦精品 | 久久黄视频 | 久久午夜精品人妻一区二区三区 | 国产综合精品视频 | 国产成人精品毛片 | 亚洲视频在线观看网站 | 乱色精品无码一区二区国产盗 | 国产情侣在线播放 | av激情在线 | 欧美日韩精品久久 | 日韩欧美视频在线 | 毛片无遮挡 | 久操国产| 亚洲 美腿 欧美 偷拍 | 国产黄色片免费 | 日韩欧美在线一区二区三区 | 国产a久久麻豆入口 | 国产无套粉嫩白浆内谢 | 91久久国产综合久久91精品网站 | 久久国产精品毛片 | 人人射| 日韩欧美xxx | 久久99热这里只频精品6学生 | 亚洲xx网| 日美女逼逼 | 国产精品麻豆入口 | 日日干狠狠干 | 国产冒白浆| 亚洲视频在线视频 | 免费的黄色一级片 | 草草草在线 | 国产精品久久久久久久成人午夜 | 青青国产在线 | av超碰在线观看 | 国内外成人在线视频 | 91久色视频 | 亚洲αv| 国产又粗又猛又大爽 |